Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0007 | 2026-09-01 18:21 | M001 V1 | Visual | PUMP-205 Pump 05 | WP15 Inspection Dock | 35% | 42 s | Success | — | — |
| A0028 | 2026-09-02 10:22 | M003 V1 | Thermal | HX-201 Heat Exchanger 01 | WP15 Inspection Dock | 29% | 23 s | Failed Target not detected | 59.1 C (questionable) | Abnormal temperature MEDIUM |
| A0047 | 2026-09-03 02:17 | M005 V1 | Acoustic | HX-201 Heat Exchanger 01 | WP15 Inspection Dock | 37% | 82 s | Success | 80.2 dB | — |
| A0072 | 2026-09-04 02:05 | M008 V1 | Acoustic | PANEL-218 Electrical Panel 18 | WP15 Inspection Dock | 62% | 90 s | Success | — | — |
| A0083 | 2026-09-04 10:07 | M009 V1 | Gauge | HX-216 Heat Exchanger 16 | WP15 Inspection Dock | 55% | 52 s | Success | 99.7 psi | — |
| A0092 | 2026-09-04 18:06 | M010 V1 | Navigation | PUMP-220 Pump 20 | WP15 Inspection Dock | 64% | 38 s | Success | 98.9 pct | — |
| A0110 | 2026-09-05 02:33 | M011 V1 | Acoustic | PANEL-218 Electrical Panel 18 | WP15 Inspection Dock | 18% | 35 s | Failed Reading unreliable | 70.9 dB (questionable) | — |
| A0118 | 2026-09-05 10:21 | M012 V1 | Thermal | PANEL-218 Electrical Panel 18 | WP15 Inspection Dock | 24% | 18 s | Failed Sensor timeout | 63 C (questionable) | Abnormal temperature MEDIUM |
| A0139 | 2026-09-06 02:23 | M014 V1 | Visual | HX-202 Heat Exchanger 02 | WP15 Inspection Dock | 27% | 79 s | Success | 83 score | — |
| A0159 | 2026-09-06 18:23 | M016 V1 | Visual | HX-216 Heat Exchanger 16 | WP15 Inspection Dock | 25% | 86 s | Failed Target not detected | 82 score (questionable) | — |
| A0176 | 2026-09-07 10:19 | M018 V1 | Thermal | HX-217 Heat Exchanger 17 | WP15 Inspection Dock | 50% | 86 s | Success | 65 C | — |
| A0197 | 2026-09-08 02:14 | M020 V2 | Acoustic | PANEL-203 Electrical Panel 03 | WP15 Inspection Dock | 75% | 48 s | Success | 77.5 dB | — |
| A0203 | 2026-09-08 10:06 | M021 V2 | Acoustic | VALVE-207 Valve 07 | WP15 Inspection Dock | 88% | 48 s | Failed Reading unreliable | 52.9 dB (questionable) | — |
| A0220 | 2026-09-08 18:24 | M022 V2 | Visual | PANEL-218 Electrical Panel 18 | WP15 Inspection Dock | 68% | 14 s | Success | 88 score | — |
| A0238 | 2026-09-09 10:15 | M024 V2 | Thermal | PANEL-203 Electrical Panel 03 | WP15 Inspection Dock | 62% | 33 s | Success | 57.4 C | — |
| A0260 | 2026-09-10 02:23 | M026 V2 | Acoustic | HX-210 Heat Exchanger 10 | WP15 Inspection Dock | 52% | 66 s | Success | 79.4 dB | — |