Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0261 | 2026-09-10 10:02 | M027 V2 | Navigation | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 89% | 45 s | Success | 94.2 pct | — |
| A0262 | 2026-09-10 10:05 | M027 V2 | Acoustic | VALVE-207 Valve 07 | WP12 Heat Exchanger Area | 86% | 67 s | Success | 70.5 dB | — |
| A0263 | 2026-09-10 10:07 | M027 V2 | Gauge | HX-217 Heat Exchanger 17 | WP06 Compressor Area | 83% | 73 s | Success | 111.7 psi | — |
| A0264 | 2026-09-10 10:10 | M027 V2 | Thermal | PANEL-211 Electrical Panel 11 | WP07 Control Room Corridor | 80% | 43 s | Success | 57.8 C | — |
| A0265 | 2026-09-10 10:12 | M027 V2 | Acoustic | HX-202 Heat Exchanger 02 | WP02 Electrical Room | 76% | 49 s | Failed Reading unreliable | 70.8 dB (questionable) | Abnormal vibration HIGH |
| A0266 | 2026-09-10 10:15 | M027 V2 | Navigation | HX-219 Heat Exchanger 19 | WP13 Warehouse Corridor | 73% | 86 s | Success | — | Signal degradation MEDIUM |
| A0267 | 2026-09-10 10:17 | M027 V2 | Visual | HX-210 Heat Exchanger 10 | WP11 Battery Room | 70% | 29 s | Success | — | — |
| A0268 | 2026-09-10 10:20 | M027 V2 | Gauge | PUMP-205 Pump 05 | WP10 Valve Station | 67% | 74 s | Success | — | — |
| A0269 | 2026-09-10 10:22 | M027 V2 | Navigation | HX-219 Heat Exchanger 19 | WP13 Warehouse Corridor | 64% | 78 s | Success | 96.3 pct | — |
| A0270 | 2026-09-10 10:25 | M027 V2 | Gauge | HX-208 Heat Exchanger 08 | WP03 Cooling Loop | 61% | 30 s | Success | 125.5 psi | — |