Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0251 | 2026-09-10 02:02 | M026 V2 | Visual | PANEL-212 Electrical Panel 12 | WP08 Turbine Hall North | 79% | 90 s | Success | 98 score | Visual defect MEDIUM |
| A0252 | 2026-09-10 02:04 | M026 V2 | Gauge | HX-208 Heat Exchanger 08 | WP03 Cooling Loop | 76% | 47 s | Success | 101.4 psi | — |
| A0253 | 2026-09-10 02:06 | M026 V2 | Thermal | HX-216 Heat Exchanger 16 | WP13 Warehouse Corridor | 73% | 79 s | Success | 67.1 C | — |
| A0254 | 2026-09-10 02:09 | M026 V2 | Visual | VALVE-207 Valve 07 | WP07 Control Room Corridor | 70% | 55 s | Success | 90 score | — |
| A0255 | 2026-09-10 02:11 | M026 V2 | Acoustic | MOTOR-206 Motor 06 | WP14 Auxiliary Systems Bay | 67% | 81 s | Success | 68 dB | — |
| A0256 | 2026-09-10 02:13 | M026 V2 | Navigation | HX-219 Heat Exchanger 19 | WP13 Warehouse Corridor | 64% | 48 s | Success | 88.9 pct | — |
| A0257 | 2026-09-10 02:16 | M026 V2 | Gauge | VALVE-207 Valve 07 | WP12 Heat Exchanger Area | 61% | 50 s | Success | 93.5 psi | — |
| A0258 | 2026-09-10 02:18 | M026 V2 | Navigation | PANEL-211 Electrical Panel 11 | WP09 Turbine Hall South | 58% | 31 s | Success | 79 pct | — |
| A0259 | 2026-09-10 02:20 | M026 V2 | Visual | PANEL-215 Electrical Panel 15 | WP02 Electrical Room | 55% | 36 s | Success | 95 score | — |
| A0260 | 2026-09-10 02:23 | M026 V2 | Acoustic | HX-210 Heat Exchanger 10 | WP15 Inspection Dock | 52% | 66 s | Success | 79.4 dB | — |