Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0241 | 2026-09-09 18:01 | M025 V2 | Navigation | HX-201 Heat Exchanger 01 | WP05 Pipe Gallery | 91% | 77 s | Success | 90.3 pct | — |
| A0242 | 2026-09-09 18:03 | M025 V2 | Visual | VALVE-207 Valve 07 | WP12 Heat Exchanger Area | 89% | 81 s | Success | 77 score | — |
| A0243 | 2026-09-09 18:05 | M025 V2 | Navigation | PANEL-218 Electrical Panel 18 | WP12 Heat Exchanger Area | 87% | 62 s | Success | 87 pct | — |
| A0244 | 2026-09-09 18:07 | M025 V2 | Navigation | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 85% | 40 s | Success | 94.4 pct | — |
| A0245 | 2026-09-09 18:09 | M025 V2 | Gauge | PANEL-212 Electrical Panel 12 | WP09 Turbine Hall South | 82% | 18 s | Success | 99 psi | — |
| A0246 | 2026-09-09 18:10 | M025 V2 | Thermal | HX-210 Heat Exchanger 10 | WP11 Battery Room | 80% | 14 s | Success | 73.9 C | — |
| A0247 | 2026-09-09 18:12 | M025 V2 | Acoustic | HX-210 Heat Exchanger 10 | WP11 Battery Room | 78% | 59 s | Failed Signal noise | 64.7 dB (questionable) | Abnormal vibration HIGH |
| A0248 | 2026-09-09 18:14 | M025 V2 | Navigation | PANEL-212 Electrical Panel 12 | WP02 Electrical Room | 76% | 39 s | Success | 97.1 pct | Signal degradation LOW |
| A0249 | 2026-09-09 18:16 | M025 V2 | Gauge | HX-208 Heat Exchanger 08 | WP07 Control Room Corridor | 74% | 35 s | Failed Sensor timeout | 117.7 psi (questionable) | Gauge out of range LOW |
| A0250 | 2026-09-09 18:18 | M025 V2 | Visual | HX-201 Heat Exchanger 01 | WP08 Turbine Hall North | 72% | 75 s | Success | 96 score | — |