Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0231 | 2026-09-09 10:01 | M024 V2 | Navigation | HX-204 Heat Exchanger 04 | WP05 Pipe Gallery | 90% | 32 s | Success | 84 pct | — |
| A0232 | 2026-09-09 10:03 | M024 V2 | Navigation | COMP-214 Compressor 14 | WP04 Pump Bay | 86% | 89 s | Success | 92.6 pct | — |
| A0233 | 2026-09-09 10:05 | M024 V2 | Acoustic | PUMP-205 Pump 05 | WP10 Valve Station | 82% | 76 s | Failed Sensor timeout | 79.6 dB (questionable) | Abnormal vibration HIGH |
| A0234 | 2026-09-09 10:07 | M024 V2 | Navigation | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 78% | 43 s | Failed Obstacle detection | 49.2 pct (questionable) | Localization issue MEDIUM |
| A0235 | 2026-09-09 10:09 | M024 V2 | Navigation | HX-202 Heat Exchanger 02 | WP08 Turbine Hall North | 74% | 66 s | Success | 84.1 pct | — |
| A0236 | 2026-09-09 10:11 | M024 V2 | Visual | HX-204 Heat Exchanger 04 | WP07 Control Room Corridor | 70% | 61 s | Success | 99 score | — |
| A0237 | 2026-09-09 10:13 | M024 V2 | Thermal | HX-216 Heat Exchanger 16 | WP02 Electrical Room | 66% | 14 s | Success | 62.5 C | — |
| A0238 | 2026-09-09 10:15 | M024 V2 | Thermal | PANEL-203 Electrical Panel 03 | WP15 Inspection Dock | 62% | 33 s | Success | 57.4 C | — |
| A0239 | 2026-09-09 10:17 | M024 V2 | Navigation | HX-210 Heat Exchanger 10 | WP11 Battery Room | 58% | 48 s | Success | 81.6 pct | — |
| A0240 | 2026-09-09 10:19 | M024 V2 | Acoustic | COMP-214 Compressor 14 | WP04 Pump Bay | 54% | 40 s | Success | 68.2 dB | — |