Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0211 | 2026-09-08 18:02 | M022 V2 | Navigation | HX-202 Heat Exchanger 02 | WP05 Pipe Gallery | 84% | 8 s | Success | 92.8 pct | — |
| A0212 | 2026-09-08 18:04 | M022 V2 | Visual | COMP-214 Compressor 14 | WP04 Pump Bay | 82% | 14 s | Success | 77 score | — |
| A0213 | 2026-09-08 18:07 | M022 V2 | Navigation | PANEL-218 Electrical Panel 18 | WP12 Heat Exchanger Area | 81% | 21 s | Failed Communication loss | — | Signal degradation HIGH |
| A0214 | 2026-09-08 18:09 | M022 V2 | Thermal | HX-210 Heat Exchanger 10 | WP11 Battery Room | 79% | 61 s | Success | 48.3 C | — |
| A0215 | 2026-09-08 18:12 | M022 V2 | Gauge | COMP-214 Compressor 14 | WP04 Pump Bay | 77% | 21 s | Success | 99.3 psi | — |
| A0216 | 2026-09-08 18:14 | M022 V2 | Navigation | HX-213 Heat Exchanger 13 | WP13 Warehouse Corridor | 75% | 57 s | Success | 79.9 pct | — |
| A0217 | 2026-09-08 18:16 | M022 V2 | Acoustic | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 73% | 11 s | Success | 68.4 dB | — |
| A0218 | 2026-09-08 18:19 | M022 V2 | Thermal | HX-216 Heat Exchanger 16 | WP13 Warehouse Corridor | 72% | 64 s | Success | — | — |
| A0219 | 2026-09-08 18:21 | M022 V2 | Thermal | COMP-214 Compressor 14 | WP04 Pump Bay | 70% | 89 s | Success | 77.3 C | — |
| A0220 | 2026-09-08 18:24 | M022 V2 | Visual | PANEL-218 Electrical Panel 18 | WP15 Inspection Dock | 68% | 14 s | Success | 88 score | — |