Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0201 | 2026-09-08 10:02 | M021 V2 | Navigation | HX-201 Heat Exchanger 01 | WP05 Pipe Gallery | 95% | 47 s | Success | 88.3 pct | — |
| A0202 | 2026-09-08 10:04 | M021 V2 | Visual | PANEL-203 Electrical Panel 03 | WP05 Pipe Gallery | 91% | 8 s | Success | 79 score | — |
| A0203 | 2026-09-08 10:06 | M021 V2 | Acoustic | VALVE-207 Valve 07 | WP15 Inspection Dock | 88% | 48 s | Failed Reading unreliable | 52.9 dB (questionable) | — |
| A0204 | 2026-09-08 10:08 | M021 V2 | Gauge | VALVE-207 Valve 07 | WP12 Heat Exchanger Area | 85% | 62 s | Success | 108.2 psi | — |
| A0205 | 2026-09-08 10:11 | M021 V2 | Acoustic | PUMP-205 Pump 05 | WP10 Valve Station | 82% | 55 s | Success | 69.4 dB | — |
| A0206 | 2026-09-08 10:13 | M021 V2 | Gauge | GAUGE-209 Pressure Gauge 09 | WP14 Auxiliary Systems Bay | 78% | 49 s | Success | 110.1 psi | — |
| A0207 | 2026-09-08 10:15 | M021 V2 | Thermal | PUMP-205 Pump 05 | WP10 Valve Station | 75% | 57 s | Success | 64.7 C | — |
| A0208 | 2026-09-08 10:17 | M021 V2 | Gauge | PANEL-218 Electrical Panel 18 | WP12 Heat Exchanger Area | 72% | 9 s | Success | — | — |
| A0209 | 2026-09-08 10:19 | M021 V2 | Acoustic | HX-217 Heat Exchanger 17 | WP06 Compressor Area | 68% | 45 s | Success | 65.8 dB | — |
| A0210 | 2026-09-08 10:22 | M021 V2 | Visual | PANEL-211 Electrical Panel 11 | WP09 Turbine Hall South | 65% | 41 s | Success | 77 score | — |