Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0191 | 2026-09-08 02:02 | M020 V2 | Navigation | HX-204 Heat Exchanger 04 | WP05 Pipe Gallery | 84% | 68 s | Failed Localization failure | 53.7 pct (questionable) | Navigation obstruction MEDIUM |
| A0192 | 2026-09-08 02:04 | M020 V2 | Navigation | HX-217 Heat Exchanger 17 | WP06 Compressor Area | 83% | 62 s | Success | — | — |
| A0193 | 2026-09-08 02:06 | M020 V2 | Thermal | HX-210 Heat Exchanger 10 | WP11 Battery Room | 81% | 39 s | Success | 43.8 C | — |
| A0194 | 2026-09-08 02:08 | M020 V2 | Thermal | HX-204 Heat Exchanger 04 | WP07 Control Room Corridor | 80% | 26 s | Success | 41.4 C | Abnormal temperature CRITICAL |
| A0195 | 2026-09-08 02:10 | M020 V2 | Thermal | PUMP-205 Pump 05 | WP10 Valve Station | 78% | 21 s | Success | 72.5 C | — |
| A0196 | 2026-09-08 02:12 | M020 V2 | Thermal | VALVE-207 Valve 07 | WP12 Heat Exchanger Area | 76% | 60 s | Success | 70.8 C | — |
| A0197 | 2026-09-08 02:14 | M020 V2 | Acoustic | PANEL-203 Electrical Panel 03 | WP15 Inspection Dock | 75% | 48 s | Success | 77.5 dB | — |
| A0198 | 2026-09-08 02:16 | M020 V2 | Navigation | PUMP-220 Pump 20 | WP07 Control Room Corridor | 73% | 85 s | Success | 91.7 pct | — |
| A0199 | 2026-09-08 02:18 | M020 V2 | Acoustic | PANEL-211 Electrical Panel 11 | WP09 Turbine Hall South | 72% | 79 s | Success | — | — |
| A0200 | 2026-09-08 02:20 | M020 V2 | Acoustic | PUMP-205 Pump 05 | WP10 Valve Station | 70% | 41 s | Success | 64.8 dB | Abnormal vibration MEDIUM |