Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0161 | 2026-09-07 02:03 | M017 V1 | Navigation | HX-201 Heat Exchanger 01 | WP05 Pipe Gallery | 71% | 88 s | Success | — | — |
| A0162 | 2026-09-07 02:06 | M017 V1 | Acoustic | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 65% | 49 s | Success | — | — |
| A0163 | 2026-09-07 02:09 | M017 V1 | Navigation | PANEL-203 Electrical Panel 03 | WP08 Turbine Hall North | 59% | 64 s | Success | — | — |
| A0164 | 2026-09-07 02:12 | M017 V1 | Thermal | PANEL-218 Electrical Panel 18 | WP12 Heat Exchanger Area | 53% | 60 s | Success | 68.2 C | — |
| A0165 | 2026-09-07 02:15 | M017 V1 | Navigation | HX-210 Heat Exchanger 10 | WP08 Turbine Hall North | 46% | 86 s | Success | 89.3 pct | — |
| A0166 | 2026-09-07 02:18 | M017 V1 | Visual | PANEL-211 Electrical Panel 11 | WP09 Turbine Hall South | 40% | 59 s | Failed Target not detected | 81 score (questionable) | — |
| A0167 | 2026-09-07 02:21 | M017 V1 | Visual | COMP-214 Compressor 14 | WP04 Pump Bay | 34% | 57 s | Success | — | — |
| A0168 | 2026-09-07 02:24 | M017 V1 | Gauge | HX-208 Heat Exchanger 08 | WP03 Cooling Loop | 28% | 86 s | Failed Target not detected | 124.2 psi (questionable) | Gauge out of range LOW |
| A0169 | 2026-09-07 02:27 | M017 V1 | Navigation | PANEL-212 Electrical Panel 12 | WP09 Turbine Hall South | 22% | 56 s | Failed Communication loss | 64.7 pct (questionable) | Navigation obstruction CRITICAL |
| A0170 | 2026-09-07 02:31 | M017 V1 | Thermal | PANEL-218 Electrical Panel 18 | WP12 Heat Exchanger Area | 16% | 30 s | Success | — | — |