Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0151 | 2026-09-06 18:02 | M016 V1 | Navigation | HX-204 Heat Exchanger 04 | WP05 Pipe Gallery | 70% | 27 s | Success | 87.1 pct | — |
| A0152 | 2026-09-06 18:05 | M016 V1 | Visual | HX-210 Heat Exchanger 10 | WP11 Battery Room | 65% | 25 s | Success | 75 score | — |
| A0153 | 2026-09-06 18:07 | M016 V1 | Visual | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 59% | 88 s | Success | 87 score | — |
| A0154 | 2026-09-06 18:10 | M016 V1 | Thermal | HX-219 Heat Exchanger 19 | WP07 Control Room Corridor | 53% | 83 s | Success | 65.3 C | — |
| A0155 | 2026-09-06 18:13 | M016 V1 | Visual | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 48% | 39 s | Success | 87 score | — |
| A0156 | 2026-09-06 18:15 | M016 V1 | Thermal | HX-202 Heat Exchanger 02 | WP05 Pipe Gallery | 42% | 11 s | Success | 75.5 C | — |
| A0157 | 2026-09-06 18:18 | M016 V1 | Gauge | HX-217 Heat Exchanger 17 | WP06 Compressor Area | 36% | 39 s | Success | — | — |
| A0158 | 2026-09-06 18:20 | M016 V1 | Gauge | HX-210 Heat Exchanger 10 | WP11 Battery Room | 30% | 72 s | Failed Reading unreliable | — | — |
| A0159 | 2026-09-06 18:23 | M016 V1 | Visual | HX-216 Heat Exchanger 16 | WP15 Inspection Dock | 25% | 86 s | Failed Target not detected | 82 score (questionable) | — |
| A0160 | 2026-09-06 18:26 | M016 V1 | Visual | PANEL-212 Electrical Panel 12 | WP09 Turbine Hall South | 19% | 64 s | Failed Reading unreliable | 74 score (questionable) | Visual defect HIGH |