Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0131 | 2026-09-06 02:02 | M014 V1 | Navigation | HX-202 Heat Exchanger 02 | WP05 Pipe Gallery | 63% | 12 s | Success | 84.8 pct | — |
| A0132 | 2026-09-06 02:05 | M014 V1 | Gauge | PANEL-212 Electrical Panel 12 | WP09 Turbine Hall South | 59% | 74 s | Failed Sensor timeout | — | Gauge out of range HIGH |
| A0133 | 2026-09-06 02:07 | M014 V1 | Gauge | HX-217 Heat Exchanger 17 | WP06 Compressor Area | 54% | 11 s | Failed Sensor timeout | 128.8 psi (questionable) | Gauge out of range HIGH |
| A0134 | 2026-09-06 02:10 | M014 V1 | Navigation | HX-217 Heat Exchanger 17 | WP06 Compressor Area | 50% | 55 s | Failed Localization failure | 48.8 pct (questionable) | — |
| A0135 | 2026-09-06 02:13 | M014 V1 | Acoustic | HX-213 Heat Exchanger 13 | WP13 Warehouse Corridor | 45% | 66 s | Success | 68.8 dB | — |
| A0136 | 2026-09-06 02:15 | M014 V1 | Gauge | HX-204 Heat Exchanger 04 | WP07 Control Room Corridor | 40% | 59 s | Success | 136.8 psi | — |
| A0137 | 2026-09-06 02:18 | M014 V1 | Visual | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 36% | 29 s | Success | 70 score | — |
| A0138 | 2026-09-06 02:20 | M014 V1 | Navigation | PANEL-212 Electrical Panel 12 | WP09 Turbine Hall South | 31% | 29 s | Success | — | — |
| A0139 | 2026-09-06 02:23 | M014 V1 | Visual | HX-202 Heat Exchanger 02 | WP15 Inspection Dock | 27% | 79 s | Success | 83 score | — |
| A0140 | 2026-09-06 02:26 | M014 V1 | Acoustic | PANEL-215 Electrical Panel 15 | WP02 Electrical Room | 22% | 67 s | Success | 76 dB | — |