Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0121 | 2026-09-05 18:03 | M013 V1 | Navigation | HX-201 Heat Exchanger 01 | WP05 Pipe Gallery | 67% | 57 s | Failed Localization failure | 52.5 pct (questionable) | Signal degradation LOW |
| A0122 | 2026-09-05 18:06 | M013 V1 | Gauge | HX-219 Heat Exchanger 19 | WP13 Warehouse Corridor | 62% | 69 s | Success | 102.8 psi | — |
| A0123 | 2026-09-05 18:09 | M013 V1 | Visual | PANEL-211 Electrical Panel 11 | WP09 Turbine Hall South | 57% | 11 s | Success | 85 score | — |
| A0124 | 2026-09-05 18:12 | M013 V1 | Visual | HX-213 Heat Exchanger 13 | WP02 Electrical Room | 52% | 40 s | Success | 98 score | — |
| A0125 | 2026-09-05 18:16 | M013 V1 | Gauge | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 48% | 85 s | Success | 140.1 psi | — |
| A0126 | 2026-09-05 18:19 | M013 V1 | Gauge | PANEL-211 Electrical Panel 11 | WP09 Turbine Hall South | 43% | 27 s | Success | — | — |
| A0127 | 2026-09-05 18:22 | M013 V1 | Thermal | HX-204 Heat Exchanger 04 | WP05 Pipe Gallery | 38% | 67 s | Failed Target not detected | 76.1 C (questionable) | — |
| A0128 | 2026-09-05 18:25 | M013 V1 | Thermal | VALVE-207 Valve 07 | WP12 Heat Exchanger Area | 33% | 48 s | Success | 65.1 C | — |
| A0129 | 2026-09-05 18:28 | M013 V1 | Acoustic | HX-202 Heat Exchanger 02 | WP07 Control Room Corridor | 28% | 32 s | Success | 81.9 dB | — |
| A0130 | 2026-09-05 18:32 | M013 V1 | Acoustic | HX-213 Heat Exchanger 13 | WP13 Warehouse Corridor | 23% | 75 s | Success | 66.1 dB | — |