Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0091 | 2026-09-04 18:03 | M010 V1 | Navigation | HX-202 Heat Exchanger 02 | WP05 Pipe Gallery | 70% | 21 s | Failed Localization failure | 67.1 pct (questionable) | — |
| A0092 | 2026-09-04 18:06 | M010 V1 | Navigation | PUMP-220 Pump 20 | WP15 Inspection Dock | 64% | 38 s | Success | 98.9 pct | — |
| A0093 | 2026-09-04 18:09 | M010 V1 | Acoustic | COMP-214 Compressor 14 | WP04 Pump Bay | 57% | 73 s | Failed Reading unreliable | — | — |
| A0094 | 2026-09-04 18:13 | M010 V1 | Gauge | COMP-214 Compressor 14 | WP04 Pump Bay | 51% | 25 s | Success | 93.8 psi | — |
| A0095 | 2026-09-04 18:16 | M010 V1 | Thermal | PANEL-212 Electrical Panel 12 | WP09 Turbine Hall South | 45% | 76 s | Success | 63 C | — |
| A0096 | 2026-09-04 18:19 | M010 V1 | Visual | PUMP-205 Pump 05 | WP10 Valve Station | 39% | 27 s | Success | 94 score | — |
| A0097 | 2026-09-04 18:23 | M010 V1 | Visual | VALVE-207 Valve 07 | WP12 Heat Exchanger Area | 33% | 81 s | Success | 82 score | — |
| A0098 | 2026-09-04 18:26 | M010 V1 | Thermal | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 26% | 30 s | Success | 53.9 C | — |
| A0099 | 2026-09-04 18:29 | M010 V1 | Navigation | HX-208 Heat Exchanger 08 | WP03 Cooling Loop | 20% | 66 s | Failed Path blocked | 37.5 pct (questionable) | — |
| A0100 | 2026-09-04 18:33 | M010 V1 | Gauge | HX-208 Heat Exchanger 08 | WP03 Cooling Loop | 14% | 27 s | Success | 150.6 psi | — |