Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0081 | 2026-09-04 10:02 | M009 V1 | Navigation | HX-201 Heat Exchanger 01 | WP05 Pipe Gallery | 64% | 61 s | Success | 84.5 pct | — |
| A0082 | 2026-09-04 10:05 | M009 V1 | Acoustic | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 60% | 37 s | Success | 70.7 dB | — |
| A0083 | 2026-09-04 10:07 | M009 V1 | Gauge | HX-216 Heat Exchanger 16 | WP15 Inspection Dock | 55% | 52 s | Success | 99.7 psi | — |
| A0084 | 2026-09-04 10:10 | M009 V1 | Thermal | HX-217 Heat Exchanger 17 | WP06 Compressor Area | 51% | 12 s | Success | 67.4 C | — |
| A0085 | 2026-09-04 10:12 | M009 V1 | Visual | HX-210 Heat Exchanger 10 | WP11 Battery Room | 47% | 54 s | Success | 96 score | Visual defect HIGH |
| A0086 | 2026-09-04 10:15 | M009 V1 | Visual | HX-204 Heat Exchanger 04 | WP05 Pipe Gallery | 43% | 59 s | Failed Target not detected | 86 score (questionable) | — |
| A0087 | 2026-09-04 10:17 | M009 V1 | Acoustic | HX-202 Heat Exchanger 02 | WP05 Pipe Gallery | 39% | 90 s | Success | 58.5 dB | — |
| A0088 | 2026-09-04 10:20 | M009 V1 | Navigation | HX-210 Heat Exchanger 10 | WP11 Battery Room | 34% | 73 s | Success | — | — |
| A0089 | 2026-09-04 10:22 | M009 V1 | Acoustic | PANEL-212 Electrical Panel 12 | WP09 Turbine Hall South | 30% | 31 s | Failed Signal noise | 81.5 dB (questionable) | — |
| A0090 | 2026-09-04 10:25 | M009 V1 | Navigation | PANEL-218 Electrical Panel 18 | WP02 Electrical Room | 26% | 40 s | Failed Communication loss | 55.6 pct (questionable) | — |