Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0061 | 2026-09-03 18:02 | M007 V1 | Navigation | PANEL-203 Electrical Panel 03 | WP05 Pipe Gallery | 74% | 47 s | Failed Localization failure | 49.2 pct (questionable) | Signal degradation CRITICAL |
| A0062 | 2026-09-03 18:05 | M007 V1 | Visual | HX-202 Heat Exchanger 02 | WP05 Pipe Gallery | 68% | 79 s | Success | 71 score | — |
| A0063 | 2026-09-03 18:08 | M007 V1 | Navigation | HX-217 Heat Exchanger 17 | WP06 Compressor Area | 63% | 71 s | Success | 97.3 pct | — |
| A0064 | 2026-09-03 18:10 | M007 V1 | Visual | PANEL-211 Electrical Panel 11 | WP07 Control Room Corridor | 57% | 36 s | Success | 85 score | — |
| A0065 | 2026-09-03 18:13 | M007 V1 | Navigation | PUMP-220 Pump 20 | WP14 Auxiliary Systems Bay | 52% | 52 s | Success | 91.7 pct | — |
| A0066 | 2026-09-03 18:16 | M007 V1 | Thermal | HX-219 Heat Exchanger 19 | WP07 Control Room Corridor | 47% | 80 s | Success | — | — |
| A0067 | 2026-09-03 18:18 | M007 V1 | Thermal | HX-210 Heat Exchanger 10 | WP11 Battery Room | 41% | 23 s | Success | 65.6 C | — |
| A0068 | 2026-09-03 18:21 | M007 V1 | Navigation | HX-217 Heat Exchanger 17 | WP06 Compressor Area | 36% | 26 s | Success | 79.1 pct | — |
| A0069 | 2026-09-03 18:24 | M007 V1 | Visual | PANEL-212 Electrical Panel 12 | WP09 Turbine Hall South | 30% | 23 s | Success | 83 score | — |
| A0070 | 2026-09-03 18:27 | M007 V1 | Acoustic | PANEL-203 Electrical Panel 03 | WP05 Pipe Gallery | 25% | 10 s | Failed Sensor timeout | 70.5 dB (questionable) | Abnormal vibration LOW |