Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0051 | 2026-09-03 10:03 | M006 V1 | Navigation | HX-202 Heat Exchanger 02 | WP05 Pipe Gallery | 67% | 77 s | Success | 91.6 pct | — |
| A0052 | 2026-09-03 10:06 | M006 V1 | Visual | PANEL-203 Electrical Panel 03 | WP05 Pipe Gallery | 61% | 88 s | Success | 82 score | — |
| A0053 | 2026-09-03 10:09 | M006 V1 | Navigation | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 56% | 76 s | Success | 80 pct | — |
| A0054 | 2026-09-03 10:12 | M006 V1 | Visual | HX-208 Heat Exchanger 08 | WP03 Cooling Loop | 50% | 28 s | Success | 72 score | — |
| A0055 | 2026-09-03 10:15 | M006 V1 | Acoustic | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 44% | 8 s | Failed Sensor timeout | 67.7 dB (questionable) | Abnormal vibration MEDIUM |
| A0056 | 2026-09-03 10:18 | M006 V1 | Visual | GAUGE-209 Pressure Gauge 09 | WP14 Auxiliary Systems Bay | 38% | 76 s | Success | 72 score | — |
| A0057 | 2026-09-03 10:21 | M006 V1 | Visual | HX-208 Heat Exchanger 08 | WP03 Cooling Loop | 32% | 21 s | Failed Reading unreliable | 90 score (questionable) | Visual defect MEDIUM |
| A0058 | 2026-09-03 10:24 | M006 V1 | Visual | PUMP-220 Pump 20 | WP14 Auxiliary Systems Bay | 27% | 46 s | Success | — | — |
| A0059 | 2026-09-03 10:27 | M006 V1 | Thermal | HX-210 Heat Exchanger 10 | WP11 Battery Room | 21% | 79 s | Success | — | — |
| A0060 | 2026-09-03 10:31 | M006 V1 | Gauge | PANEL-211 Electrical Panel 11 | WP09 Turbine Hall South | 15% | 82 s | Failed Reading unreliable | 111.6 psi (questionable) | Gauge out of range CRITICAL |