Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0031 | 2026-09-02 18:03 | M004 V1 | Navigation | HX-204 Heat Exchanger 04 | WP05 Pipe Gallery | 76% | 84 s | Failed Communication loss | 66.2 pct (questionable) | Navigation obstruction LOW |
| A0032 | 2026-09-02 18:06 | M004 V1 | Visual | HX-210 Heat Exchanger 10 | WP11 Battery Room | 70% | 53 s | Success | 90 score | — |
| A0033 | 2026-09-02 18:09 | M004 V1 | Thermal | HX-213 Heat Exchanger 13 | WP07 Control Room Corridor | 65% | 36 s | Success | 70.6 C | — |
| A0034 | 2026-09-02 18:12 | M004 V1 | Visual | HX-213 Heat Exchanger 13 | WP13 Warehouse Corridor | 59% | 77 s | Success | 78 score | — |
| A0035 | 2026-09-02 18:15 | M004 V1 | Navigation | HX-210 Heat Exchanger 10 | WP11 Battery Room | 54% | 37 s | Success | 89.2 pct | — |
| A0036 | 2026-09-02 18:18 | M004 V1 | Thermal | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 49% | 41 s | Success | 74.9 C | — |
| A0037 | 2026-09-02 18:21 | M004 V1 | Navigation | HX-217 Heat Exchanger 17 | WP06 Compressor Area | 43% | 30 s | Success | — | Localization issue HIGH |
| A0038 | 2026-09-02 18:24 | M004 V1 | Gauge | PANEL-211 Electrical Panel 11 | WP09 Turbine Hall South | 38% | 41 s | Failed Sensor timeout | 68.6 psi (questionable) | Gauge out of range MEDIUM |
| A0039 | 2026-09-02 18:27 | M004 V1 | Visual | HX-217 Heat Exchanger 17 | WP06 Compressor Area | 32% | 39 s | Success | 77 score | — |
| A0040 | 2026-09-02 18:30 | M004 V1 | Navigation | HX-202 Heat Exchanger 02 | WP08 Turbine Hall North | 27% | 59 s | Success | 88.4 pct | — |