Loading page…
| Action | When | Mission | Type | Asset | Waypoint | Battery | Duration | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|---|---|---|---|
| A0001 | 2026-09-01 18:03 | M001 V1 | Navigation | HX-201 Heat Exchanger 01 | WP05 Pipe Gallery | 75% | 67 s | Failed Obstacle detection | 44.4 pct (questionable) | Navigation obstruction LOW |
| A0002 | 2026-09-01 18:06 | M001 V1 | Visual | PUMP-205 Pump 05 | WP10 Valve Station | 69% | 63 s | Success | 85 score | — |
| A0003 | 2026-09-01 18:09 | M001 V1 | Acoustic | PUMP-205 Pump 05 | WP10 Valve Station | 62% | 16 s | Success | 63.5 dB | — |
| A0004 | 2026-09-01 18:12 | M001 V1 | Visual | PANEL-212 Electrical Panel 12 | WP09 Turbine Hall South | 55% | 30 s | Success | 83 score | — |
| A0005 | 2026-09-01 18:15 | M001 V1 | Acoustic | PANEL-215 Electrical Panel 15 | WP01 Main Entrance | 48% | 69 s | Success | 71.9 dB | — |
| A0006 | 2026-09-01 18:18 | M001 V1 | Visual | VALVE-207 Valve 07 | WP12 Heat Exchanger Area | 42% | 74 s | Success | — | — |
| A0007 | 2026-09-01 18:21 | M001 V1 | Visual | PUMP-205 Pump 05 | WP15 Inspection Dock | 35% | 42 s | Success | — | — |
| A0008 | 2026-09-01 18:24 | M001 V1 | Thermal | PANEL-218 Electrical Panel 18 | WP07 Control Room Corridor | 28% | 47 s | Success | 72.9 C | — |
| A0009 | 2026-09-01 18:27 | M001 V1 | Visual | HX-208 Heat Exchanger 08 | WP03 Cooling Loop | 22% | 61 s | Failed Sensor timeout | 75 score (questionable) | Visual defect HIGH |
| A0010 | 2026-09-01 18:31 | M001 V1 | Visual | HX-204 Heat Exchanger 04 | WP05 Pipe Gallery | 15% | 64 s | Success | 70 score | — |